A Groundwork company - serving Spring Valley, NV
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Henderson, NV

New Detached ADU in Henderson - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Spring Valley
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Henderson, NV: What It Takes and What It Costs

A new detached ADU in Henderson typically runs $45,000 to $130,000 for a modest one-bedroom unit and $90,000 to $220,000 for a full two-bedroom build with its own kitchen and full bath. Plan on 4 to 8 months from first survey to final inspection, longer if your lot needs heavy site work. Call (888) 329-9414 and we’ll walk your lot, price the scope, and put it in writing.

Call (888) 329-9414

Henderson is a city that got built fast, then filled in. Most of the housing here went up between the 1990s and the 2010s: stucco-over-frame single-family homes, tile roofs, block walls, and lots that were graded flat and finished with turf, gravel, or a pool. That build era matters for a detached ADU. You’re usually not fixing something old. You’re fitting a second structure into a backyard that was planned for a patio cover, not a dwelling.

So the real work is site logic. Where does it sit so the setbacks hold? Where does drainage go when a monsoon cell parks over the valley? How do we get power, water, and sewer out there without tearing up a finished landscape? Get those three questions right and the rest is straightforward construction.

What to look for when you compare New Detached ADU builders in Henderson

Anyone with a license can quote you a number. The bids differ in what they leave out. Before you sign, make sure every builder you’re comparing answers these the same way.

  • A written, line-item scope. Foundation, framing, rough trades, insulation, finishes, and site work each broken out. A single total hides the gaps that turn into change orders.
  • Who pulls the permit. If the builder won’t put permit responsibility in writing, that’s a red flag. In Henderson, the permit is the spine of the whole project.
  • HOA review built into the schedule. Most planned communities here run an architectural review before construction. A builder who’s never handled that layer will get you bounced.
  • Caliche and soil prep called out by name. Excavation here isn’t standard trenching. If the quote doesn’t mention rock-breaking or soil prep, it’s probably not priced yet.
  • A real workmanship warranty. Ours is the 730-Day Done Right Promise: if it’s not done right, we make it right, and that’s backed in writing.
  • Upfront pricing, no surprises. The number you see is the number you pay, and that’s stated before the contract, not after.
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

How we build a New Detached ADU in Henderson, stage by stage

A detached ADU is its own small house, so it moves through the same sequence a house does, just compressed. Here’s the real order of operations and where you make decisions.

Stage 1: Site survey, soil, and design (weeks 1 through 5). We start with a boundary survey to confirm setbacks and lot coverage, then a soil check. Henderson lots sit on carbonate-heavy caliche and expansive gypsum soils, so this stage isn’t a formality. You decide the footprint, the bedroom and bath count, and whether you’re going one story or two. The design gets drawn, then submitted for permit and, where applicable, HOA architectural review.

Stage 2: Permit and HOA approval (weeks 4 through 12). These run in parallel where the HOA allows it. You’ll sign off on the plan set and the exterior finishes here: stucco color, roof material, window style. This is the stage where a good builder saves you time and a careless one costs you a month. We handle the submittals.

Stage 3: Excavation and foundation (weeks 1 through 3 of construction). Once the permit’s in hand, crews mobilize. That means rock-breaking through hardpan, import and compaction of proper base, and forming and pouring the slab or stem wall. Here’s where we work around the heat: pours go in early morning, before the afternoon sun pushes temperatures past 100°F, so the concrete cures evenly and doesn’t crack.

Stage 4: Framing, rough trades, and dry-in (weeks 3 through 8). Walls go up, then the roof, then the rough plumbing, electrical, and HVAC get run and inspected. You’ll pick fixtures and finishes during this window: cabinets, countertops, flooring, plumbing trim. The structure gets dried in and stucco goes on. Every trade is inspected before it’s covered.

Stage 5: Finishes and final inspection (weeks 8 through 14). Insulation, drywall, paint, cabinets, countertops, tile, trim, and fixtures. Then the final building inspection, then a walkthrough with you. We don’t call it done until you’ve walked every room and we’ve cleared the punch list.

The choices you’ll make on a New Detached ADU in Henderson

Most of the budget doesn’t live in the framing. It lives in the spec sheet. Here’s where the real decisions are and what each one honestly does to the number.

  • Footprint and bedroom count. A 500-square-foot one-bedroom sits at the low end of the range. A 900-square-foot two-bedroom with a full kitchen pushes toward the top. Every extra square foot carries foundation, framing, finishes, and HVAC with it.
  • Roof: tile versus shingle. Tile matches the rest of Henderson’s housing stock and handles the UV and heat better over time, at a higher up-front cost. Shingle is cheaper to install and lighter on the structure. Both work; tile earns its money back in a climate that bakes roofs for 20 years.
  • Stucco versus siding. Stucco is the native look here and holds up to the sun. It also cracks if it’s not detailed right, which is why the sealants and control joints matter more than the color.
  • Plumbing finish and fixtures. You can spend a little or a lot here. American Standard and Toto both make dependable, low-maintenance fixtures that stand up to desert water, with Toto typically costing more up front and lasting longer.
  • Wet-area waterproofing. A shower gets wet every day for years. Schluter’s waterproofing systems cost a bit more than a bare membrane but eliminate the leak-prone corners that show up five years in.
  • Detached kitchen or kitchenette. A full kitchen adds appliances, a wider range of electrical circuits, and venting. A kitchenette keeps the unit lighter and cheaper, and suits a rental or guest use just fine.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What a New Detached ADU costs in Henderson, NV

Expect $45,000 to $130,000 for a standard one-to-two-bedroom detached unit, and up to $220,000 for a larger, more custom build. The range is wide because the variables genuinely matter.

  • Size and layout: square footage drives foundation, framing, roofing, and finishes. A 500-square-foot plan and a 1,000-square-foot plan aren’t close.
  • Site conditions: caliche and expansive soils mean rock-breaking and proper base prep. A difficult lot adds real dollars before a wall goes up.
  • Utility runs: the distance from the main house to the ADU, and whether you’re trenching through finished hardscape, moves the number. Longer runs mean more trenching and more restoration.
  • Finish level: builder-grade versus upgraded cabinets, countertops, tile, and fixtures. This is the easiest dial to turn.
  • Permit and HOA scope: a straightforward ADU permit versus a project that needs a variance or extensive HOA review. The complexity shows up in the price.

A written estimate covers design, permit submittals, site work, foundation, framing, all rough and finish trades, and final inspection. It doesn’t cover landscaping restoration beyond what’s specified, furniture, or utility connection fees the city bills directly. Every line gets itemized, and we pull the permits. Current offers include $1,000 off projects over $10,000 and 0% financing for 18 months, so a five-figure build doesn’t have to land all at once.

What Henderson homes specifically do to this job

A remodeled family room with new windows and a window seat

Henderson’s soil is the biggest single factor. Caliche hardpan and gypsum sit under most lots here, and standard trenching won’t cut it. Crews plan for rock-breaking and proper soil prep before any foundation goes down, and that cost shows up early in every honest quote. Then there’s the approval layer: across Green Valley, Anthem, and MacDonald Ranch, HOA architectural review boards sit between you and a construction start, and they care about stucco color, roof material, setbacks, and how the ADU reads from the street. Getting that submission right the first time saves a month. The heat does its own work too. Summer days push past 110°F, so crews start at dawn and schedule pours around the cool morning hours to control curing. Drainage matters as well: monsoon cells drop a lot of water fast, so grading has to move it away from both structures. If your site needs new hardscape to get equipment in, homeowners often pair this with Concrete Driveways & Concrete Work in Henderson or Paver Driveways in Henderson so the access and the finished look land together.

Because the ADU is part of a broader project on your lot, it helps to see the full picture. This is a single piece of a Home Additions & ADU in Henderson scope, and our Home Additions & ADU service covers every piece of it. We regularly work across Henderson and the surrounding ZIPs, so we know what this city’s lots and review boards expect.

Serving Henderson, NV – Our Local Coverage Area

We serve Henderson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked about a New Detached ADU in Henderson

Get a free estimate for your New Detached ADU in Henderson

A framer checking new wall framing on a home addition

If you’re planning a New Detached ADU in Henderson, the fastest way to a real number is a walk of your lot. Call (888) 329-9414 to schedule your free estimate and design consult. A live person answers, day or night, and we’ll review your setbacks, soil, utility runs, and HOA rules, then hand you a written line-item quote. No pressure, no vague totals. When the call is over, then the crew shows up.

Written by the team at Groundwork Construction Co.

Why Henderson Chooses Groundwork Construction Co. of Spring Valley

We set the standard for new detached ADU in Henderson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Henderson

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Henderson Customers Say

Trusted by homeowners across Henderson and surrounding areas.

★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodel

More services in Henderson

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Spring Valley

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Spring Valley team

A local vetted partner works across Spring Valley and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Henderson?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Henderson.

(888) 329-9414

Request a Free Estimate in Henderson

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch