A Groundwork company - serving Spring Valley, NV
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Las Vegas, NV

Garage Conversion ADU in Las Vegas - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Spring Valley
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Las Vegas: What It Actually Takes

A garage conversion ADU in Las Vegas typically runs $45,000 to $130,000 and takes 4 to 7 months from the first drawing to the final inspection. The work turns your existing attached garage into a permitted, rentable or family-ready living unit: new slab or floor system, framing, insulation, electrical, plumbing, HVAC, and a code-compliant egress window. Most Las Vegas garages are already under roof, which is why this is the least expensive way to add a dwelling unit here. Call (888) 329-9414 to schedule a free estimate.

Call (888) 329-9414

How a Garage Conversion ADU Comes Together, Stage by Stage

A garage converted into a guest room and home office

Every garage is different, but the sequence for a conversion in Las Vegas follows the same order. Here’s what happens and what you decide at each step.

Stage 1: Feasibility and design (2 to 4 weeks)

We walk the garage, check the existing slab and header heights, and pull the property record to see what Clark County will want. You decide the layout: studio, one-bedroom, or a separate bedroom with its own bath. This is also where HOA design review enters the picture if you’re in Summerlin or one of the northwest master-planned communities, and that approval can add two to three weeks before we touch a tool.

Stage 2: Permits and site prep (3 to 6 weeks)

We submit the plans, then wait on Clark County plan review. Meanwhile, the garage gets cleared and the existing slab is evaluated. A post-tension slab is common in 1990s – 2000s tract homes, and cutting into one to add plumbing requires locating the tendons before the saw goes in. You decide whether to keep the existing slab (cheaper) or pour a new floor with a vapor barrier and finished topping (better for tile and hardwood).

Stage 3: Structural and rough-in (3 to 5 weeks)

Framing goes in for the new room walls, then plumbing, electrical, and HVAC run through it. If you want a kitchenette and bath, we rough in the drain lines and supply, which is the single biggest cost variable. We also cut in the egress window and the new exterior door that turns the garage into a living space. You decide on window style and where the mechanical unit lives.

Stage 4: Insulation, drywall, and finishes (4 to 6 weeks)

Insulation and drywall close the walls, then flooring, cabinetry, countertops, and fixtures go in. This is where your finish grade matters most, and where most of the visual difference lives. You pick flooring, paint, cabinet fronts, and fixtures. We install them and keep a written schedule so you know which week each trade shows up.

Stage 5: Final inspections and handover (1 to 2 weeks)

Clark County inspects the electrical, plumbing, mechanical, and building work. We correct anything flagged and schedule the final walkthrough. You get a clean, permitted unit and the paperwork to back it. That’s also when the 730-Day Done Right Promise kicks in, so any workmanship issue in the first two years is ours to fix.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Make on a Garage Conversion ADU

Most of the budget lives in these decisions. Here’s the honest trade-off on each.

  • Flooring: Luxury vinyl plank handles Las Vegas’s dry heat and occasional monsoon humidity without gapping or cupping, and runs mid-grade on cost. Porcelain tile is more durable and cooler underfoot but costs more to install and is harder on your feet in a small unit.
  • Slab vs. new floor system: Keeping the existing slab saves money but limits plumbing placement. A new floor with a vapor barrier and finish topping adds cost but gives you freedom on layout and a cleaner finish.
  • Kitchenette vs. full kitchen: A sink, two-burner cooktop, and small fridge is the budget choice. A full kitchen with a range and vented hood costs more and needs more electrical and gas work, but it’s what makes the unit truly independent for a renter or aging parent.
  • Bath configuration: A shower-only bath is cheaper and easier to clean. A tub adds resale appeal for families but raises the plumbing and finish cost.
  • Windows and doors: Impact-rated glazing costs more upfront but stands up to monsoon wind and reduces heat gain. Standard glazing is cheaper but you’ll feel the difference in July and August.
  • HVAC: A ductless mini-split is the simplest and most efficient for a single room. Tying into the main house system is cheaper to install but taxes your existing unit and complicates zoning.

What a Garage Conversion ADU Costs in Las Vegas, NV

A framer checking new wall framing on a home addition

Plan on $45,000 to $130,000 for a garage conversion ADU in Las Vegas. The low end is a studio with a shower bath, mid-grade finishes, and no plumbing relocation. The high end is a one-bedroom with a full kitchen, impact glazing, custom cabinetry, and a new floor system. Here’s what moves the number:

  • Size and layout: A 400 sq ft studio is the floor of the range; a 700 sq ft one-bedroom with a full kitchen is the ceiling.
  • Plumbing relocation: If the bath or kitchen sits far from the existing drain stack, the trenching and re-route adds real money. Keeping fixtures close to the existing lines is the single biggest cost saver.
  • Structural work: Cutting a door into the main house, raising a header, or working around a post-tension slab all add cost. We plan around these, not through them.
  • Finish grade: Cabinet fronts, countertops, fixtures, and flooring are the swing. The framing and rough-in cost the same whether you pick builder-grade or custom.
  • Permit scope: Clark County review, HOA design review, and any dust-control requirements for exterior work all add time and cost. We pull the permits and pass the inspections, so nothing lands on you unpermitted.

A written estimate from us lists each line item, so you see exactly what’s included and what isn’t. Things that typically sit outside the base number: furniture, appliances you buy yourself, landscaping around the new exterior door, and any HOA fees. If you’re pairing the conversion with fresh parking, homeowners often add Asphalt Driveways & Resurfacing in Las Vegas or wider Concrete Driveways & Concrete Work in Las Vegas once the old garage bay stops being a car space, and we can quote both in the same visit.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Las Vegas Homes Specifically Do to This Job

Most of the garages we convert here sit on post-tension slabs in 1990s – 2000s Summerlin and Pequop-area tract and semi-custom homes: stucco over frame, tile roofs, and a slab you have to map before you cut. In the older 1970s – 80s ranches around 89108 and 89130, the slabs are simpler but the framing and wiring are older, so we often find undersized headers or aluminum branch wiring that has to be corrected before the unit can pass inspection. That’s a Las Vegas reality, not a generic one. The dry heat and intense UV also mean exterior stucco patches and sealants at the new door and window need to be right the first time, or they’ll fail within a couple of summers. Out back, this is a permitting town first: Clark County dust-control rules and SNWA turf-removal rebate requirements shape grading and exterior finishes from day one, and in Summerlin and the northwest master-planned communities, HOA design review can add weeks before the first nail. We work Las Vegas and the surrounding ZIPs (89165, 89166, 89162, 89111) regularly, and we know what the inspectors look for.

Serving Las Vegas, NV – Our Local Coverage Area

We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Garage Conversion ADU in Las Vegas

A remodeled kitchen with a waterfall island and wood cabinets

Get a Free Garage Conversion ADU Estimate in Las Vegas

A free on-site estimate starts with us walking the garage, checking the slab, and asking how you want to use the unit. You get a written, line-item quote and a realistic schedule, not a ballpark over the phone. If your plan is bigger and the conversion is part of a full Home Additions & ADU in Las Vegas, we scope the whole job together. See our Home Additions & ADU service for the wider picture. Call (888) 329-9414 to schedule your estimate. Upfront pricing, no surprises.

Written by the team at Groundwork Construction Co.

Why Las Vegas Chooses Groundwork Construction Co. of Spring Valley

We set the standard for garage conversion ADU in Las Vegas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Las Vegas

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Las Vegas Customers Say

Trusted by homeowners across Las Vegas and surrounding areas.

★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new paver pool deckAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gate

More services in Las Vegas

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Spring Valley

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Spring Valley team

A local vetted partner works across Spring Valley and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Las Vegas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Las Vegas.

(888) 329-9414

Request a Free Estimate in Las Vegas

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch