Cabinets & Countertops in Boulder City, NV: What the Job Really Involves
Cabinets & countertops in Boulder City typically run $14,000 – $45,000 for a full kitchen’s worth of casework and stone, with cabinet installation alone at $4,000 – $13,000 and countertops at $2,000 – $6,500. Most projects take two to four weeks from demo to final caulk, depending on whether we’re relocating plumbing, electrical, or structure. That range reflects the market here, not a national average. Call (888) 329-9414 and we’ll price your actual kitchen, not a hypothetical one.
How a Cabinet and Countertop Job Runs, Start to Finish

Cabinet and countertop work follows a rhythm that doesn’t vary much, and knowing it up front is the difference between a smooth three-week job and a six-week mess. Here’s the real sequence.
Stage 1: Template and order (day 1, roughly 2 – 3 hours on site). We measure every wall, check for out-of-square corners, and note where the floor dips. In older Boulder City bungalows that dip is often an inch or more. This is when you finalize cabinet layout, door style, and countertop material. Cabinets get ordered here and take two to four weeks to arrive, so this decision is the long pole.
Stage 2: Demo and rough-in (days 1 – 2 of install week). Old cabinets come out, and we open the wall where plumbing and electrical need to move. If you’re keeping the sink and range in place, this is quick. If you’re relocating either, add a day and a rough-in inspection.
Stage 3: Cabinet set (days 2 – 3). Base cabinets get leveled and shimmed, wall cabinets hung and screwed into studs, then crown and light rail go on. Boxes are shimmed true even when the wall isn’t, which matters in cinder-block construction where furring strips can sit proud.
Stage 4: Countertop template and install (days 3 – 10). Stone gets templated after cabinets are set, fabricated, then installed. Quartz and granite need a physical template, so expect a gap of several days between cabinet set and stone drop. Laminate or butcher block can go in the same week.
Stage 5: Sink, faucet, and punch (final 1 – 2 days). Undermount sink gets set with the right bracket system, faucet tied in, dishwasher reconnected, and every drawer and door adjusted. You walk the job with us before we call it done.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
Most of the money and most of the regret live in four decisions. Here’s what each one costs you in real terms.
- Cabinet box construction. Plywood boxes outlast particleboard in desert heat cycling, where humidity swings from single digits to monsoon-season spikes. Plywood adds roughly 15 – 25% to cabinet cost but holds screws and resists swelling. Particleboard is fine for a rental, not for a kitchen you’ll keep.
- Door style and finish. Painted MDF doors look clean and cost less; solid wood and thermofoil each have trade-offs in sun exposure. Painted finishes in a south-facing kitchen near the lake can fade faster, so a quality topcoat matters more here than in a shaded Henderson kitchen.
- Countertop material. Quartz runs $60 – $100 per square foot installed, granite $50 – $85, laminate $25 – $45, butcher block $40 – $70. Quartz is non-porous and needs no sealing, which suits a busy household; granite needs periodic sealing but handles hot pans better. Cambria quartz is a solid mid-to-upper choice; for a value kitchen, laminate still wins on square footage per dollar.
- Sink and faucet. Undermount stainless and fireclay farmhouse sinks dominate. A quality pull-down faucet from a name brand like American Standard or Kohler will outlast a bargain fixture by years, and the labor to replace it later costs more than the upgrade did up front.
Drawer hardware, soft-close hinges, and pull-out organizers add $800 – $2,500 across a kitchen but are the details people notice every single day. Worth it.
What Cabinets & Countertops Cost in Boulder City, NV

The broad range for the full job is $14,000 – $45,000. Cabinet installation sits at $4,000 – $13,000, countertop installation at $2,000 – $6,500, and an island, if you’re adding one, at $3,000 – $10,000. Those numbers hold steady because they’re built from what this market actually charges, not a national calculator.
Five things push a job toward the top of that range:
- Size and layout. A galley kitchen with 12 linear feet of cabinet is a different job than a 30-foot U-shape with an island.
- Existing condition. Out-of-square walls, water damage behind the old sink, or a floor that needs leveling all add labor. In 1930s-40s Boulder City bungalows, this comes up more often than not.
- Relocating plumbing, gas, or electrical. Moving a sink, range, or dishwasher circuit adds $1,500 – $4,000 in demo, rough-in, and inspection.
- Material grade. The difference between a stock cabinet line and a semi-custom KraftMaid run, or between laminate and quartz, can swing the total by $8,000 – $15,000.
- Permit scope. A straight cabinet swap often needs no permit; moving plumbing or gas does, and that means a city inspection.
Every written estimate we hand you is line-item: cabinets, stone, labor, disposal, permit fees if any. What’s typically not included is the surprise stuff – a rotted subfloor under the sink, or a wall that isn’t where the plan said it was. We photograph and price those before touching them, so the number you see is the number you pay. No change orders you didn’t approve.
See the difference
Before
After
Before
After
Before
AfterWhat Boulder City Homes Specifically Do to This Job
Cabinet and countertop work in Boulder City is shaped by something you won’t feel in Henderson: this town is ringed by federally protected land. The Lake Mead National Recreation Area and the Boulder City Conservation Easement hem the city in, so almost no greenfield building happens here. Nearly every job we touch is a remodel, an addition grafted onto an old lot, or a renovation inside the Historic District. That means crews work inside a tightly bounded footprint, and the housing stock is old.
Much of the core housing dates to the 1930s-40s Boulder Dam worker era: small stucco and cinder-block bungalows with Bureau of Reclamation-era plans. We regularly find original plumbing and block walls that aren’t plumb. Furring strips need shimming, and cabinets have to be set true against walls that never were. In the Historic District downtown, exterior work runs through strict design review, and while cabinets and countertops are interior, any change to a window or door as part of the project can trigger approval. Coverage spans ZIP codes 89005 and 89006; if you’re in Boulder City proper or out toward the lake side, we work the whole town.
Serving Boulder City, NV – Our Local Coverage Area
We serve Boulder City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in Boulder City

Plan on two to four weeks from demo to final walkthrough, with the longest stretch being the two-to-four-week lead time on cabinets themselves. Stone templating adds several days between cabinet set and countertop install, so the calendar is really three phases, not one continuous push. Call (888) 329-9414 and we’ll map your timeline against cabinet lead times.
A straight like-for-like swap usually needs no permit, but moving plumbing, gas, or electrical does, and that work gets inspected. Because Boulder City is inside a historically regulated footprint, we check scope against city requirements before we start rather than after. Call (888) 329-9414 and we’ll tell you exactly what your job needs.
Yes, and most of our Boulder City cabinet jobs stay in place, keeping the sink, range, and dishwasher where they are. That saves $1,500 – $4,000 in rough-in and keeps the job to the cabinet and stone phase. If your layout genuinely doesn’t work, we’ll say so and show you the cost of moving it. Call (888) 329-9414 for a free estimate.
The full job runs $14,000 – $45,000, with cabinets at $4,000 – $13,000 and countertops at $2,000 – $6,500 on their own. Size, existing condition, material grade, and whether you’re moving utilities are the four levers. Call (888) 329-9414 for an exact quote – estimates are free.
Every cabinet and countertop job is covered by our 730-Day Done Right Promise: if it isn’t done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it’s in writing. Call (888) 329-9414 to schedule your free estimate.
Get a Free Cabinets & Countertops Estimate in Boulder City
If you’re weighing a cabinet and countertop project, the fastest way to a real number is a free on-site estimate. We’ll measure your kitchen, talk through cabinet lines and stone options, and hand you a line-item quote with no surprises. A live person answers (888) 329-9414 around the clock. If your project is part of a larger Kitchen Remodeling in Boulder City, or you’re pairing it with a Garage Conversion ADU in Boulder City or a New Detached ADU in Boulder City, we scope it all together through our Kitchen Remodeling service. Call today and let’s get you a number.
Written by the team at Groundwork Construction Co. of Spring Valley.