A Groundwork company - serving Spring Valley, NV
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Las Vegas, NV

New Detached ADU in Las Vegas - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Spring Valley
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What a New Detached ADU in Las Vegas Costs and How Long It Takes

A new detached ADU in Las Vegas typically runs $45,000 to $130,000 and takes five to eight months from the first site visit to the final inspection, with most of that time spent on Clark County plan review and site prep rather than the build itself. You’re adding a fully separate, self-contained home on your lot: its own foundation, utilities, roof, and finishes. That range covers a compact one-bedroom build; larger units with full kitchens and custom finishes land toward the top. Call (888) 329-9414 to schedule a free on-site estimate.

Call (888) 329-9414

How We Build a New Detached ADU in Las Vegas, Stage by Stage

We sequence every detached unit the same way, and the schedule only shifts when inspections or a slow material order forces it. Here’s how the months actually break down and what you decide at each step.

  • Site visit and design confirmation (week 1 – 2). We walk your lot, check setbacks and existing utilities, and confirm the footprint. This is where you lock in size, layout, and whether you’re building for rental income or family. You decide the square footage and rough finish tier now, because both drive the drawings.
  • Plans, permits, and dust-control setup (weeks 2 – 12). Drawings go to Clark County, and the review clock is the biggest variable. We pull the grading and dust permits in parallel and arrange soil work around caliche. You approve the final plan set and site plan before we file.
  • Site prep and foundation (weeks 8 – 14, overlapping review). Once permits clear, we strip the area, grade for drainage, address any caliche or bedrock, and pour the slab. Concrete gets scheduled early morning or at night during summer. You confirm utility trench routes and the slab layout before the pour.
  • Framing, rough-ins, and dry-in (weeks 14 – 22). Framing, roof, windows, and doors go up, then plumbing, electrical, and HVAC rough-ins are inspected before walls close. You choose window type, door styles, and whether the unit gets its own meter; this is the point of no return on utility layout.
  • Finishes and final walkthrough (weeks 22 – 30). Insulation, drywall, flooring, cabinets, fixtures, and landscaping go in, followed by the final inspection. You sign off at a walkthrough, and every project is covered by the 730-Day Done Right Promise from that day forward.
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between on a Detached ADU

The finishes are where a $45,000 unit becomes a $130,000 one. Here’s what actually matters and which way each choice cuts.

  • Footprint and layout. A studio or one-bedroom keeps costs down and fits tighter lots; a two-bedroom adds square footage and resale appeal but pushes you higher in the range. Decide this first, because everything else hangs off it.
  • Exterior finish. Stucco matches most Las Vegas homes and holds up well against UV when it’s sealed properly. James Hardie siding resists cracking and moisture better but costs more up front. Either way, the desert sun demands quality sealants and a fresh coat schedule you shouldn’t skip.
  • Roofing. Tile roofs match the surrounding Summerlin stock and last decades under intense sun; a metal roof reflects heat and sheds monsoon rain fast but costs more. We install GAF and CertainTeed systems, and the choice really comes down to matching your main house versus maximizing efficiency.
  • Windows and doors. Andersen or Pella double-pane units cut cooling loads and hold up better to extreme heat swings than builder-grade aluminum. Carriage-house style garage or entry doors give a detached unit a custom look that reads as part of the property.
  • Fixtures and systems. A heat-pump HVAC with a smart thermostat handles the 115°F+ summers better than window units. Water-efficient fixtures from American Standard or Toto and a tankless heater suit the dry climate and help with water conservation. Higher-efficiency choices raise the price but lower the monthly cost of running the place.

What a New Detached ADU Costs in Las Vegas, NV

A remodeled family room with new windows and a window seat

The market range for a new detached ADU in Las Vegas is $45,000 to $130,000. Here’s the line-item breakdown and what moves you toward either end.

Line item Typical range
Compact one-bedroom detached ADU (base) $45,000 – $70,000
Larger two-bedroom with full kitchen $90,000 – $130,000
Site prep, grading, caliche removal Bundled, higher on rocky lots
Utility trenching and separate meter Adds cost; varies by lot
Premium finishes (tile roof, Andersen windows) Pushes toward the high end

What moves the number: square footage is the biggest driver. Next comes existing condition, meaning how much caliche or engineered fill the site has and whether trenches have to be cut through it. Relocating or expanding utilities for a fully separate meter adds cost. Material grade, from base flooring to premium tile and windows, shifts the total noticeably. Permit scope, including grading and dust-control permits, is a real line item, not a rounding error.

A written estimate from us is line-item and fixed, so the number you see is the number you pay, with no change orders for items we already quoted. It covers design coordination, permits, foundation, framing, utilities, finishes, and the final inspection. What it doesn’t cover is landscaping beyond code-minimum, future maintenance, or upgrades you add after the plan is approved.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Las Vegas Homes Specifically Do to This Job

Building here is a permitting and site-prep exercise before a single foundation goes down. In Summerlin and the northwest foothills, caliche layers and shallow bedrock routinely stop trenchers, so we test and plan grading early rather than discovering the problem mid-build. Clark County’s dust-control permit regime means we set up dust suppression and erosion control before breaking ground, and the Southern Nevada Water Authority’s turf-replacement rules shape how we approach landscaping around the unit. The flat, engineered-fill lots that dominate ZIPs like 89134 and 89144 handle storm runoff poorly if grading is off, so we build drainage in from day one. HOA design review in the master-planned northwest can add weeks, so we factor that review into the schedule before filing anything with the county. Homes across Las Vegas are mostly 1990s – 2000s stucco-and-tile tract and semi-custom builds on post-tension slabs, so we match the new unit to that existing stock rather than dropping in a generic design.

Serving Las Vegas, NV – Our Local Coverage Area

We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions About a New Detached ADU in Las Vegas

A framer checking new wall framing on a home addition

Get a Free On-Site Estimate for Your New Detached ADU in Las Vegas

Building a detached unit is a big call, so start with a free on-site estimate. Call (888) 329-9414 and we’ll answer, walk your lot, check setbacks and utilities, and put a line-item price and schedule in front of you. Homeowners often pair a new ADU with Concrete Driveways & Concrete Work in Las Vegas or a Paver Driveways in Las Vegas to connect the unit to the street, and if the ADU is part of a full Home Additions & ADU in Las Vegas plan, we’ll scope the whole thing together through our Home Additions & ADU service. The first call is free and there’s no pitch.

Written by the team at Groundwork Construction Co.

Why Las Vegas Chooses Groundwork Construction Co. of Spring Valley

We set the standard for new detached ADU in Las Vegas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Las Vegas

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Las Vegas Customers Say

Trusted by homeowners across Las Vegas and surrounding areas.

★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateA new stained cedar privacy fence

More services in Las Vegas

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Spring Valley

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Spring Valley team

A local vetted partner works across Spring Valley and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Las Vegas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Las Vegas.

(888) 329-9414

Request a Free Estimate in Las Vegas

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch